Unley Medical Facility
- Client
- Blubuilt
- Scope
- Continuous Flight Auger (CFA) piling, Design and Construct, Bored pile wall, limited headroom
This project required IGP to design and install over 200 x 350mm and 450mm diameter CFA piles to form a basement retention wall for a new underground carpark. IGP utilised both our EK60 and a hired 2t limited headroom machine to work safely adjacent SAPN overhead lines.
To meet the basement architectural constraints our EK60 had to install piles within 100mm of adjacent structures and keep to tight positional and verticality tolerances.